Home Account Login Knowledgebase Support Forums  
  Bodhost UK Data Center Information
 



 
DATA CENTER INFRASTRUCTURE
Structure: Concrete slabs with fireproof surroundings.
Facade: Windows strengthened with Aluminium and gold tint
Roof: Its space are in connection to limitation of mechanical structures.
Floor Loading: 60 - 100 pounds per sq. ft. live load, also reinforced at column lines.
Ceiling Heights: From one Slab to another slab: 15 ft, to lowest beams: 9'-11"
Column Distance: 30 ft. x 30 to 34 ft.
Electrical Capacity: Equal Power distribution (60 watts per sq. ft.- 80 watts per sq. ft). Each cabinet 4' x 6' gets 110 volt, 20 amp circuit. The main power sums up to 480 volt, 3 phase. power supplies are now also activated in Multiple DC.
Elevators: Large eight person carrier elevator and One freight elevator with a 3,500-pound capacity.
Fire Suppression: Wet Risers set in at every square position.FM-200 system is installed.
Security: Securitized Units such as surveillance cameras, finger-pringt as well as Keycard system in order to manage entries along with highly-trained security team on every floor and entries.
Risers: Computerized Fully master-planned rise system / HVAC pipe system / Electrically monitoration.
Parking: Front space and undergroung parking space with security surveillance cameras with 24/7 Monitor room.
Delivery Area Loading: Rear entry of the data center in the surface available for tenants and equipment delivery.

Operating Engineers: Building system managed by on-sire building system as well as tenant service.
Primary Power: The main source post tower has 480 volt, 3-phase power which is thereafter delivered to central power raise on every floor through a conduit riser system. Every Power load is distributed accordingly. Typical power allocation is approximately 40 watts per sq. ft. which is expandable to 80 watts per sq. ft.
Emergency Power: Two 2000KW generator. The power is allocated on every floor through a conduit riser system.
Fuel Storage: The main post tower has fuel storage and more than 24 hours of generator storage.
HVAC Dedicated Cooling: This allow a fully redundant, 2,500-ton condenser water system installed with wet risers on every floor.

 
 
Legal Notice :   Privacy Policy  :   Terms and Conditions  :   Contact Us  :   Site Map

Copyright © 1999-2008, Bodhost.co.uk(Bodhost Ltd.) All rights reserved.

Web Hosting with LIVE SUPPORT